The New Normal in Consulting Engineering: Drone Technology

The New Normal in Consulting Engineering: Drone Technology

Publication: FIDIC Annual Conference
Issue: September 2020

The emergence of the Covid-19 pandemic has pushed many industries to revisit the way in which they conduct business. This has led to companies, including those in the consulting engineering sector, to consider new technologies with the aim of adapting and innovating to remain relevant in the current climate whilst also ensuring minimal disruption in the project cycle.

Drone Technology has been identified as one such technology which has gained popularity in recent years. The use of Drone Technology as a tool for the development of infrastructure is wide reaching and can be applied to several parts of the project cycle. These are further discussed below.

Drones for Aerial and Infrastructure Survey

The focus on social distancing and restrictions in travel have meant that drone surveys prove to be useful. A drone survey refers to the use of a drone, or Unmanned Aerial Vehicle (UAV), to capture aerial data. This data and subsequent software can be used to create a range of outputs including elevation and 3D models of the project areas as well as existing infrastructure.

In some countries legislation allows for lower altitude flight with the use of drones, compared to other aerial methods, allowing for more detailed surveys. This enables the user to extract information such as highly accurate distances or volumetric measurements to meet their needs.

The use of drones for survey is generally faster, requires less manpower and allows for survey in remote and dangerous areas, which are deemed costly and high risk when considering tradition land surveying methods. It also allows engineers to inspect infrastructure, such as cooling towers and reservoirs in a safer manner.

When considering infrastructure surveys, thermal imaging allows designers a chance to gain a clear picture of existing infrastructure conditions, including insight on existing reinforcement in structures identifying issues such as, identifying leaks in water systems. Information obtained through such methods allows for data to be easily exported to BIM applications for further modelling.

Drones for Site Supervision

The use of drones on construction sites to assist with supervision has the potential to increase efficiency of monitoring and data collection as construction progresses. Inspections can be undertaken more frequently, and a greater amount of area can be assessed efficiently. The use of drones provides the project team the ability to obtain aerial images of the site without physically having to travel to site to determine whether elements are constructed in accordance with design specifications.

Drones can create real-time aerial images from sites which can be shared with site personnel and team members based at offices; project teams can meet virtually to deliberate project programming, resource requirements and potential challenges.

Since drones can access hazardous locations of a construction site, project teams can also take advantage of this to identify and address technical problems in locations where it might be risky to do so in person. Additionally, drones equipped with surveillance instruments can improve safety inspections due to the fast access to images as well as real time metrics from a range of locations around the jobsite.

Drone technologies allow consulting engineers to perform efficient services for the development of infrastructure in the new normal. The capability of drones to deliver topographic mapping, surveying, remote monitoring, and progress reporting can prove to be an invaluable tool throughout the life cycle of a construction project.

They can efficiently collect data of a high standard with relative ease and enables teams to interact remotely.  By utilizing the advantages of drone technology project teams can save time, costs and reduce risk while working under regulations set in the new normal. Drones are a significant technological advancement that can be utilised as an asset in the consulting engineering industry far beyond the challenges of delivering infrastructure in the current socio-economic conditions.

 

Download the full article.

Download

Recent Insights

September 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
September 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
August 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
July 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
July 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
June 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
June 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
June 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
May 2024
Knight Piésold: Ensuring African Excellence in the DRC
May 2024
Wild Coast N2 Highway Project Taking Shape
May 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
April 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
April 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
April 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
April 2024
Risk and Informed Approach to TSF Design and Operation
February 2024
Empowerment and Resilience
January 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
January 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects
November 2023
Knight Piésold Commences with the ESIA for Haib Copper
November 2023
Insights from the Compilation and Critical Assessment of Breach and Runout Characteristics from Historical Tailings Dam Failures: Implications for Numerical Modelling