Staged Emergency Spillway Development – Design Considerations

Staged Emergency Spillway Development – Design Considerations

Author: K.L Ainsley, B. Otis, E. Chong
Conference: 87th Annual Meeting of the International Commission on Large Dams
Date: June 9-14, 2019

ABSTRACT
Under most circumstances, spillway structures are required for the safe operation of a dam, helping to control the release of excess water within the impoundment to a location downstream. Where spillway facilities exist, it is essential that they are capable of operating throughout their design life and within prescribed regulatory requirements. This condition becomes more challenging when an emergency spillway needs to be incorporated into the design of a tailings storage facility (TSF). TSFs are typically designed for the final arrangement anticipated at mine closure. In order to reduce mine operating capital costs, TSFs are often constructed in staged lifts as dictated by tailings production estimates. Consideration for the spillway is required with each lift. Several factors influence the dam and spillway geometry including supernatant pond volumes, climatic conditions, tailings production rates, volumetrics of the impoundment, spillway location, geotechnical considerations, mine closure criteria. This paper will explore the key considerations for the development of a TSF emergency spillway. The spillway development at the Phu Kham Copper-Gold Operation (operated by Phu Bia Mining Limited) located in the Lao People’s Democratic Republic will be used to illustrate these considerations.

 

Download the full technical paper.

Download

Recent Insights

October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
September 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
September 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
August 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
July 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
July 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
June 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
June 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
June 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
May 2024
Knight Piésold: Ensuring African Excellence in the DRC
May 2024
Wild Coast N2 Highway Project Taking Shape
May 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
April 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
April 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
April 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
April 2024
Risk and Informed Approach to TSF Design and Operation
February 2024
Empowerment and Resilience
January 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
January 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects